The Engineering Stakeholder Interview
Boxes and Arrows
JANUARY 7, 2013
Try to speak with engineering management as well as the design engineer(s), if such a role exists; it’s seldom a good idea to involve the entire engineering team at this point. If there are no design engineers, a system architect and GUI lead may be the best option for software expertise. Engineering stakeholders.
Let's personalize your content